Exhibitors reserving raw space, including inline raw exhibit space, must submit detailed stand drawings that include renderings or photos of the stand, technical drawings, hanging elements (including signage, lighting trusses and security points) with dimensions for approval to EBACE management by 24 March 2023.
Note: Hanging signs are only permitted in perimeter locations, which are highlighted in green on the online floor plan.
All required stand drawing elements should be included in a single PDF.
Stand drawings will not be reviewed until show management has received complete drawings, Exhibitor Notification of Intent to Use Exhibitor-Appointed Contractor Form, EAC contract and EAC certificate of insurance.